Answer Posted / tarique08
But in fields only 406 nos of bricks are required for 1 m3 of volume
Because of the volume of mortar nos of bricks are reduced to 406 from 500nos
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
on what basis the partial factor of safety are decided? form the load combinations
what are the types of design? which type of method is used at what type of design & why?
How to calculate plastering for elevated water storage tank
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
Who name us Engineer & Why?
Howmuch bend to be provide for 200/600 BEEM
What is OSHA compliance?
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
yasser arfatcompleted his degree in civil from which university
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????