Comparing to AC transmission, corona & R in DC transmission
is…….
a) lower b) higher c) same
Answer Posted / kunjan
(a) Lower
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
CT Ratio of a energy meter connection is Red Phase : 100/5A, yello Phase : 50/5A & Blue phase : 100/5 A what is the overall Multiplication factor
how to select the mpcbs and contactor for 3 phase 30 hp star delta motors.for plc control.and tell me the calaculation for future use.
what is the need to express current and voltage in rms value? rms value is also called as effective value,what is effective value?
What are the material used for resistor?
Why the arms of delta in a delta-wye power transmission system are kept constant??
Dear Sir/Madam, I have one questions we have three steam turbines and one Gas turbine and our industry linked with the public network, we have protection system one of the protection is reverse power we can export just four MW only i would like to ask about how to calculate the reverse power. Thank you in advance best regards
CAN WE CALCULATE THE NEGATIVE SEQUENCE AND ZERO SEQUENCE REACTANCE OF A GENERATOR USING ONLY ITS RATED VOLTAGE, KW, PF AND SYNCHRONOUS REACTANCE??? IF YES, THEN HOW??
plz send me the placement interview question and answers of whizchip(technical and apttitude)..i have an interview in next.
how can we make cable shedule for controll wiring ? which details must be required for it.?
How to back charge the Gas turbine generator
In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.
What are high pass filter and low pass filter? and What are the flowmeter ?
Benifits of 3ph 4 wire metering over 3ph 3 wire
what is there inside an inverter and how it works?
What are the site acceptance tests for power cables, DG Sets, LT panels & 30kVA UPS ?