Answer Posted / akarshit kanwar
Kit Kat fuse is a rewireable fuse .It is of two type kit and kat. The part which carries fuse element is know as kit and the part which carry the fuse base is know as kat. Kit is fit over kat
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
in general it is observed in power stations, the tertiary winding is used in higher rating Y-Y auto transformer but not in Y-Y power transformer. is the tertiary winding is compulsory then why it is not using in power transformerÂ
what is mean by D.O. in distribution line poles?
how to find out 3 phase complex power in per unit in unbalanced system?
In ups static switch if i gives the supply at output end it will open the circuit in stactic switch or not if it will open then how it operates.
how to test the turn ratio of 3 phase transformer using volt meter shoe the curcit diagram.
how to measure dc earth leakage current?
Dyn1 transformer vector group testing how to do
Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
what is the difference between dry and wet type of 132kV terminations. which one is durable
why do we use 25kv supply for traction purpose?
to vary valtage from 0 - max a variac is necessary . so how to design for high power applications nearly about 200KW power
WHAT IS VCB SAFETY
how can we save enegry by using VFD for Resiprocating Air compressor which is having more unloading running hours
Whether should be the oil level in OCTC transfomer? It should be upto winding immersed completely or should be upto tap changer s/w? How it will affect the performance of the transformer. Rating may be 33KVA
Write masons gain formula.