Till how many days can we keep a cement bag without using? And on what conditions the cement will get spoiled?
Answer Posted / aabid
Cement 3 month after 25 %
6 month 50%
So use for before 3 month
.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Explain what is change order request?
Pls explain me about tension and compression in a flat slab
explain what do you mean by the property development.
Define What materials were used to build the Golden Gate Bridge?
How high should the water tank be to provide a 60 psi at base of this water tower?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
what's the formula for calculate pcc for matt(45mm aggregate)?
WHAT DLC DESIGN IN CONSTRUCTION
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
psc girder detail
What is the Hardness of M-40 grade concrete, general and theoratical
how to remove the quantity of metal 1 and metal 2 in concrete
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
what is the coefficient for running feet to cft coversion both area and price
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work