How steel required for 823 sqm of flooring work in 150mm c/c in single jali?
Answer Posted / aabid
7 ton required for steel
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
Explain what is Critical Path Method (C.P.M)?
what is the basic difference between Coloumn & Shear Wall
how to compute slab reinforcements on step by step procedures??
What is an object snap mode?
Spider cracks occur in beam bottom due to––
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
what is work of planning deptt. in any construction compny (in road project)
Define What is Civil Engineering?
Why the finite element method is lower bound solution?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.