how much water you will add to the mix, for making 1 m3 of
concrete to achieve strength of mix 20N/mm2 at 28 days.
Answer Posted / munir
150
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
Difference between lime, distemper and plastic emulsion?
What is costing in 100squre feet bricks
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
What is the cemnent ratio
what is project?
acceptance criteria for concrete works
What are the Types Of DPC and its Thickness used?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
In which code the the maximum height of concrete casting has been explained
how many material required for brickbat water proofing of toilets.
Describe the various methods of concrete curing?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.