For Beam steel reinforcement detailing, in the End of the beam do the making of L shape in the rebar is essential in all the cases, specially in the ends of the Beam?
Answer Posted / syed ishaque
At end support beam reactions are fixed beams.. maximum negative moments at support to balance these moments need to provide L and also some time provide extra bars. As per size and length of beams..
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the techniques to measure road difference?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
How much time Required for PPR pipe network testing
What is the Hardness of M-40 grade concrete, general and theoratical
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
acceptance criteria for concrete works
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
Why steel rods are produced only in even dimensions?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
What is thumb rule in quantity and cost estimation of a residential building?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)