What is the function of Lightning Arrester & Wavetrap in
Power system ??
Answer Posted / tapomay mondal
Lightning Arrester or LA is a protection device that is connected to the line in parallel.In stable system LA is working as a insulator. But when surge current travel through the line then it is worked as a conductor and pass the huge current to the ground.
For transformer protection you can see LA in HV side as well as LV side. This protection is mainly for high voltage system.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
tell me about roaster switch .& what is the function in transmission & distribution?
for 4 MVA , 33K.V/6.6K.V transformer. secondary side the connected load is 3000H.P. What is the rating of capacitor bank to be insttaled.
At what factor resistance r of a conductor depends?
reason of diode failure in alternator
Lt motor sfu flashing reasons?
what are the difference between PLC and embedded
what is meant by poly phase induction motor ? how its operating by single phase or three phase?
What is the difference between amorphous core transformer and CRGO core transformer?.
HOW TO CALCULATE AMPs OF CURRENT TRANSFORMER IN HT Panel
what is the id1 & id2 setting in differential protection relay of CSPC?
15hp motor wound by 0.9mm & 0.95mm magnet wire. at no load test it draw 4.2A current. Another motor with same condition draw 9.2A current. How can that occur? pls help
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
What are the causes for the failures of sandwich type (Al) busducts?
how to electrically make connection to ferroli GN2N?
george phenomenon of synchronous machine