Answer Posted / varun
M20means
1bag cement (2tokri of cement)
1.5 sand (3 tokri of sand)
3 aggregate (6 tokri of bajri)
1:1.5:3
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is Grid floor and mention its advantages ?
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
How to calculate woden area in sft and Cft
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
Minimum and maximum size of the building components
What is Base Shear ?
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
how to preaper for interview wat they asked in interview give me idea
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
Why should you show Client/Engineer activities clearly on the project plan?
List out the types of roofs?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
Describe Briefly The Various Methods Of Concrete Curing?