Answer Posted / varun
M20means
1bag cement (2tokri of cement)
1.5 sand (3 tokri of sand)
3 aggregate (6 tokri of bajri)
1:1.5:3
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
quantity of material needed for rubble stone masonry for 1:4 and 1:6
How to calculate the crank rod in slab
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
how to convert sand in Cft to Kgs
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
Why are the bolts that hold steel rails together in oval holes?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
Can we use the flyash bricks in brick bat coba?
can i get hindi version of is codes based on civil engineering?
How do you determine specific gravity of cement?
How can you achieve soil enforcement?
how to calculate valuation for the old building?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.