Answer Posted / balraj
1. Hold the two bars.
2. minimise the shrinkage.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
How many bricks are there in 100cft?
how much cement sand n bricks required in im3?and how much in plaster?
Volume of 25kg putty bag & 40 kg putty bag volume??
How to calculate the quantity of ingredients of M20 grade concrete?
how do you stabilize a waterlogged area in road construction
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
crank types
Calculation of curtain wall of box culvert
Calculation of Pier Cap with tapper area?
What is the difference between a wood shake and wood shingles?
Define What are the reasons for geotechnical site investigations in Uganda?
How many cement sand ballast in cc 1:4:8 40mm
Explain the Strength of brick?
What is kn measurement?