Answer Posted / danish ahmed
For slab 1%
For beam 2%
For column 2 or 2.5%
| Is This Answer Correct ? | 6 Yes | 4 No |
Post New Answer View All Answers
can stub column take the load as main column
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
All aptitude question of Bechtel
What is Critical path in Ms-Project ?
Who name us Engineer & Why?
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
why building got air crack? if it get in one particular are what is means?
Wats the formula of eccentric footing and how was calculated from concrete qty
How can I make justification between using concrete grade c35 compare c37?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
Explain what is the difference between built area and super built up area?
What is the diameter of the 3"inch nails?
Define What is the meaning of a blue land surveyors flag?
what is the water-cement ratio of mix design while 30mpa in 7 days?