What is the amount of brick in cum we get in a BIG LORRY
approx ??
Answer Posted / raja rammohan nayak
For 10 cum brick required 5000.
For 1 cum brick required=5000/10=500
So and..500 nos
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
pls give me some basic informations in construction of a structure?
sir, whitch is the best book (writer name) for prepration of gate....
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
How high should the water tank be to provide a 60 psi at base of this water tower?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Explain what is Hybrid Foundation?
In cement concrete how to check a quality of material also proportion of material at site ?
please briefly explain calculating or estimating steel quantity for a RCC column?
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.