How to get Electrical Supervisory Licence in chennai Tamil
Nadu from TNEB. I am BE EEE graduate.

Answer Posted / farhad

Just simply follow the rules define by that institute.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why ahould you show client/engineer activities clearly on the project plan

2342


what causes contact chatter when there is no demand on the air conditioning unit?

1615


what is the diference between the 4pole & 6pole DC Motors & what is advantage 6pole over the 4pole ?

1532


What is center gravity load in substation?

1932


Explain with example of functional requirements of protection relay in terms reliability, selectivity, sensitivity

1384






Can we check ELCB constantly from R1 to R8 phase in 1 no DB?

1226


what do you mean by plant earthing system.

1544


If only R Phase is connected in 2 pole elcb, n is not connected than it will work or not in ground fault.

989


why power not passes in plastic and rubber material

1538


what will happen if synchronous machine rotor fed from single phase ac supply 

1301


1600 KVA ka transformer hi aghar lt side par 800A aur voltage 420 ho to HT side ki cable ki rating keya ho gi?

1588


what questions are asked in the interview for the post of an electrical maintenance engineer in FMCG companies?

2148


What is the difference between grid and off- grid system??

1482


how indusrial diesel generator work

1462


This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.