For slabs = 1.0 % of concrete volume.
For Beam = 2 % concrete volume.
For column = 2.5 % of concrete volume.
| Is This Answer Correct ? | 34 Yes | 2 No |
Post New Answer View All Answers
what are the five benefits of using standard terminology in the measurement process?
explain fie benefits of using standard terminology in the measurement process
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
what is directivity effect?
Why should you show Client/Engineer activities clearly on the project plan?
List out some of the common problems that architect have to tackle it?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
How many cum of 9.5mm stone in 1 ton ?
Explain what is the release of lien?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
what is the tensile strength of 10swg and 8swg gabion wire?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
how to calculate rate analysys of 1:6 plastering 10 sq m