Answer Posted / sarath naryan nair
For slabs = 1.0 % of concrete volume.
For Beam = 2 % concrete volume.
For column = 2.5 % of concrete volume.
| Is This Answer Correct ? | 34 Yes | 2 No |
Post New Answer View All Answers
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
Critical Path Method is...
3. What are the disadvantages of your present job, things you do not like about it?
What are the steps involved in the concreting process?
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
Explain different types of rcc pipes.
Why concrete barriers have curved surface profiles?
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
Explain what is structural frames or systems?
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
what values & beliefs have guided you in your career path
Define What is diversion tunnel in a dam?
How does a traffic light signal work ?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
how do you calaculate the total steel quantity of an rcc building using thumb rule?