Answer Posted / sunil
If +ve & -ve comes means DC , so T/C output is DC mV
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how do i tune dearator pr control valve using PID. we set the set point is 0.6kg/cm2 now i want 0.5 to 0.7kg/cm2 limits so what should i give p,i,d values. then pls explain how do set pid values for control valve tuning?
Speedtronic system .
use of split range ? where it is used ? in which control loop it is used ?
What is the Working principle of Dozing valve?
Draw a wheatstone bridge circuit showing supply, meter and 3 wire RTD connection
Sir, I am working as a Instrument Engineer in Grasim Industries. Can any body provide question answer for interview purpose
1.what is controller proportional gain 2.what is the controller intergral action time. 3.A proportional plus derivative controller that has a proportional band of 20% and a derivative action time of 0.1 minutes. Construct the shape of the output waveform for the triangular input if the input rises and falls at the rate of 4 units per minute.
Which is your favourite subject & explain any one topic of it.
my data card only does run in my mobile so how can change it that it run other mobile & computer and i can stor data in my data card
If a control valve is hunting means means if we are giving 50% to the cv, the cv will open at 51% then slowly slwoly it will reaches 49% , so what to do for solve this problem. The cv is double acting and mounted for anti surge operation, it having 4 nos. volume booster, one sov, one positioner, etc..?
How is automatic reference junction compensation carried out in temperature recorders?
what is output of FOUNDATION FIELD BUS transmitter
What are different type of instrument cable
all questions related to instrument technician in any offshore oil and gas company.