Answer Posted / bugti.ghalib@yahoo.com
A camber is a curved surface from top centre of road to the end of carrageway, which is used to drain off rain water. OR in other words we can say that it is an inclination provide in the carraige way for drain off water
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
why & what is perchatage we are using fly ash in concrete?
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
How to find beam R/F cutting length
How to calculate quanty of steel in four leg stirrups?
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
How to calculate carrying capacity of the existing water supply trunkmain
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
Stringer How many cm goes to landind
acceptance criteria for concrete works
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
How many axes do cartesian coordinate system has?
how to convert sand in Cft to Kgs
what is tension footing?