Answer Posted / pravin
Boiler Reheater protection;
To avoid starvation in reheater circuit some minimum steam flow needs to be maintained during startup conditions which will be ensured through HP/LP bypass valves failing which protection acts.this protection acts only when fuel flow is greater than certain limit specified by Boiler mfgrer and hp/lp bypass valves are less than specific % and unit Load criteria/gv,icv full close.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
LAPT working in alternator / generator
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
How do you consider that you can improve and what assistance do you need to achieve this
can dp type level transmitter work in under vaccum condition
what is natural frequency of turbine shaft .
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
what is the meaning of SST300 V56A in SIEMENS turbine
what is the trip circuit supervision in an electrical meaning?
explain how the third harmonic content of the magnetising current affects transformer design
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
what is restricted earth fault explain in details
What is difference between secondary Air & Tertiary Air and Their use.?
By any way can we increase the B check hours from 300 to 500
operation
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525