Write down a formula to calculate the number of 50Kg bags of cement for moulding
of cement blocks of tcm thick by 20cm high by 40cm long on site with
a mix ratio of 1 bag of cement to 3 wheelbarrows of sand . the sand is measured at a STRUCK( WATER LEVEL) 65 litres capacity wheelbarrow.
TEL: +237 674630019
Answer Posted / moses
Q=25Ωn/2(-t^2-45t+2400)
Where, n=number of blocks required
t=thickness of block in centimetres (cm),which is valid for all positive
numbers except zero since the thickness cannot be zero.
Ω=sum of mix proportion
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
what is the specific gravity of rubble in plum concert
How much for the BRC lapping in full yield and half yield < and which table to get it ?
what is idealized curve for concrere and steel
How do we determine the specific gravity of a cement?
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
how do you stabilize a waterlogged area in road construction
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
what is BPM in concrete demolition hammers. what is better a higher value or lower
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
What is meant by solid geometry?
What are the uses of layer?
what's the formula for calculate pcc for matt(45mm aggregate)?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation