What is reheater protection based on what mft will be act on RH protection

Answer Posted / venkatesh muthi

When boiler is working and sending steam to turbine,if there is no path for steam flow.then to boiler drum pressure increases to avoid that.we use reheater protection.like if both hp stop valves closed and hpbypass valves closed or both ip stop valves and lpbypass valves closed(when it is aft synch). And before synch condition is if both hpbypass and lpbypass valves closed.if both ip stop valves and lpbypass is closed then there is no steam flow from boiler reheater leading to increase in pressure at reaheter and temp also increases as continuous heating.so it is called reheater protection.to protect reheater

Is This Answer Correct ?    4 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

1765


how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1229


what is the basic use of power plant in equipment

1225


what is the meaning of SST300 V56A in SIEMENS turbine

3885


operation

1374






What is LB-SR.

2483


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

1880


explain how the third harmonic content of the magnetising current affects transformer design

2770


How do you consider that you can improve and what assistance do you need to achieve this

1332


what is restricted earth fault explain in details

1623


By any way can we increase the B check hours from 300 to 500

1695


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2070


LAPT working in alternator / generator

2545


why airtel use + 24 volts and other operators use -48 volt

2106


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1278