Body earthing is used for body leakage current to earth without
human body harmful.Neutral earthing is used for giving an earth path to
unbalanced current. It also balance the voltage in each
phase.suppose neutral is not working
properly,then in case of lightning on the body of
transformer then very large current will flow through body
earthing wire to neutral earthing wire.So it will be
dangerous for transformer.
so to avoid from destruction both body earthing & neutral
earthing are separately properly earthed.Minimum 3meter
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What types of high speed CMOS circuits have you designed?
5- What is the task (function) of the excitation and isolation transformers in power plant? 6- What is the task (function) of LCI (A), LCI (B) and LCI (COS) in power plant? : LCI (A) and LCI(B) are load commutating inverter for generator turbine starting. , LCI (COS) is load commutating inverter change over switch
how can decide the current rating of oltc
we have 3 single phase transformers. how will we generate 6 supply from 3 phase supply input
why current flow to the opposite direction of flow of electrons???????????
Why field rheostat is kept in minimum position?
how can i reduce sparking without stepdowning the voltage
Dear Sir I am living in Jaipur Rajasthan now I did complete my b tech degree in electrical engineering in 2012 Sir how I gate certificate of competency for electrical supervisor
what is the internal working of star delta starter
how to control the speed to switched reluctance motor
What should be current in the Primary and secondary side of 1000KVA (11KV Supply)Transformer.?
how the testing of protection CT Testing done through Primary injection kit please describe in detail procedure...
What is the slip speed?
1) What are your personal strength? 2) What are your personal areas of improvement? 3) What are your expectations from from a particular job? 4) what are your carrier objectives?
1. If 8.35%Z means the percentage impedance of 132kV-line from power company, we will like to confirm its base capacity?