Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
how do you stabilize a waterlogged area in road construction
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
What is Rankine Cycle?
What is the diff between cad & cadd?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
how we can find sieve #4 is 4.75mm?
at which depth the construction of tunnel is economical from cost and engineering aspect.
What are the responsibilities of a site manager?
plumbing CPVC fitting FTE Brass full form
about higyway engineering
What is the use of offset command?
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure