What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?
Answer Posted / manjesh yadav
220*2 220*2 2*10*8-2*5*8= 960
MNS= (Anchoered Length) 2*10* Dia Of Bar - 2* No Of Bend(5)* Dia Of Bar
80
So Total Length =960mm
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
about higyway engineering
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
What is the standard volume of pharma in cub ft
why we can use dust in concrete insted of fly ash
which red: used in roof teping, then use only cement
For fine aggregate which is most suitable River sand or crusher sand & why ?
What are some structures that may be subjected to fatigue?
how to calculate load bearing column
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
give me the rate analysis for Bituminous Macadam and SDBC
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
as per is code, what is the minimum content of opc and ppc cement for rcc structure
what is differences between ferrock and concrete ?