In an existing power plant (phase I) with step up transformers (3nos) with Ynd1 vector group to the 400KV bus bar,an extension power plant (phase II) with transformers (4nos) with Ynd11 vector group >. what are the consequences of such configuration ,please note that % impedance are also differ i.e. 15% & 10.5% the reason was that auxiliary supply interface is at different voltage levels i.e 400v & 6.6KV in phase i and phase II respectively .please advise ! Thank you !
Answer Posted / mohammed
My reply was not to accept this configuration as it may cause a forced synchronize and floating currents and at the 400KV bus bsr hence false tripping during switching of remote parts of the grid !
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is a converter reactor ?
what is the formula for calculating the phase clerance between two phases and phase to earth how to calculate the cable for a motor
when you are from engineerng back groung student then y r u choossng bank job? plz give me best answer
what are differential gain and common-mode gain of a differential amplifier?
please tell me what is a light up procedure of Cfbc boiler and what it's axuillaries of cfbc boiler?
How many kw will suply from one db
Actuality I have at home electrical panel with 220v 50hz, and I want to converter from there to 110v 60hz, to wiring on the half of my house. Also I like to keep another half of my house with the original 220v 50hz. What is the best and safety way to do?
What is Symbian.?
What is the design of mechatronics system used in washing machines?
If we have use two power cable for incomer, that time how many use cbct for earth leakage protection? 1 or 2 if 1 way? If 2 way?
What do you understand by aerodynamics/performance analysis?
What type of pump may be appropriate for a liquid near saturation, a low flow rate, and very limited npsha (net positive suction head available)?
how power is generated,and transmitted to our home..pls explain briefly in simple words.
Can a transistor be obtained by connecting tow semiconductor diodes back-to-back?
what will be the maximum winding temperature of 6.6kv HT motor 450kw, Full load current 49A. 50Hz Frequency.