Answer Posted / vipin kumar
Opc = (ordinary Portland cement ) of this setting time 10to30 minuts( first to last) ppc= ( plane cement concrete) without Re inforcement cement concret
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What are some structures that may be subjected to fatigue?
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
how i convert mm into standard wire guage (SWG)no.
What is the meaning of soil reinforcement?
What is structural frames or systems?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
List out some of the checking’s, done at the completion of construction?
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
What is the difference between linear dimension and aligned dimension?
Mention what are the composition of a landfill?
how many cement used in single story residential building per sqft
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
why the openings of sieves are square io size?
What is the cost difference between site mix and ready mix concrete per cubic meter
significance of specific surface area of particles?