Answer Posted / faiyaz ahmad
DCS has three input network communication field control station engineer work station
PLC has many input proximity switch push button limit switch
PLC output is motor heater solenoid valve led
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is a vortex flow meter,mass flow meter and electromagnetic flow meter.particular use of this.means in which condition particular meter is used.
anybody having Qatar Petroleum questions for instrument Technician offshore ....please send me
Why all the drains(Gland sealing,ESV,Casing inlet etc) are directly connected to the flash tank instead of hotwell of the condensor in the power plant? My Email Id:naba02222@gmail.com
How to measure the dust in chimney(spm)?
Do you have reference list?
What is force balance principle? State some of its’ advantages.
how can i check vortex shedder bar it is ok? if there is ohms condition are shown correct?
May I have a brief note above the voltage barriers? Whats is the purpose? Please mail me if you've operational details, mail id: rajkumar.diice@gmail.com
I faced several time siemens ps2 positioner automatically getting Chang in it's set point direction after auto calibration So is there any causes biside this or any permissives ?
What is the difference between uv and ir scanners? and what is the workig principle of both
How ejector(or)evactor air pump is working in thermal power plant?
How to calibrate Magnetic flow Transmitter in Field
how to calibrate Necleuonic level transmitter.?
IN CONTROL VALVE SPECIFICATIONS GENERALLY TERM " DE- 200" ."DM -400"USED,, WHAT IS DE/ DM STANDS FOR?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.