How to check the quality of fine aggregate on site?
Answer Posted / ramar
1.Pour water on the surface of the aggregate,unwanted aggregates visible white in color.
2.aggregate should be rounded,and also different in size
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to take concrete quantity for precast segment for viaduct project?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
How can you distinguish between sorption, absorption and adsorption?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
specifications of fe500 steel
VAT and CST ? Which benefits for buyer ? Why benefits?
Define What is the force exerted by the Tacoma narrows bridge?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Who built the sears tower?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
what is the 0 value in quantity surveying
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?