How many layers in 12mm and 18mm plywood?
Answer Posted / dunga.chakradhar
How to find the layers, pls explain it
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Tell me about triple point of water.
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
Special thing in designing a overhead reservoir ? which is different from an ordinary design
what discoveries did you have in relation to your course?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
Who name us Engineer & Why?
What is a bearing capacity of soil?
what is a well
Different sizes of Hollow blocks and its weight. Thanks.
What is reinforced concrete?
how to identify the failure of building by expansive soils
how lap length is increased with increase of Grade of steel?