How Can Calculate Plastering Quantities For 260.04 square meter by using CM 1:4 with 25mm Thick ?
Answer Posted / rrbharathreddy94@gmail.com
Plastering with CM = 1:4
Thickness = 25 mm
Area to be plastered = 260.40 square meter
Thickness of moter layer =25mm=0.025M
volume of moter required =260.40X0.025=6.51 Cum
Add 15 percent of allowences for undualation of surface & wastage = 6.51/100X15=0.976Cum
=6.51+0.976= 7.486 Cum ( total Volume of moter required)
Sand required for 7.486 Cum of CM 1:4= 7.486 Cum
Cement required for 7.486 Cum of CM 1:4= 7.486/4=1.871Cum
Wt of Cement Required =1.871X1440=2694.96 Kg = 2695 Kg (say).
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How do you maintain water pressure?
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
What is the meaning of soil reinforcement?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
what is meant by shear center?????
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
Did any of the egyptian pyramids ever fall down?
How much does the leaning tower of pisa lean?
what is the composition of good brick ?
how many spacers we need for 1 ton reinforcement? aprox.
what is the 0 value in quantity surveying