Answer Posted / sivamarg@gmail.com
centralised AC system of multistoreyed buildings run by 200 / 300 / 400 Tonne capacity chiller.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
One House is being constructed by an Civil Engg. all pillars are as per structure, but north side there should be 4 pillars among two at back side were 6" inside from the border and remaining two comes front were placed 1'6" inside. is it ok as per vaastu, else if i alter the alignment what would be the best idea, kindly help me.
what is the rate of 4000sqft rate, with material tile plumbing all work with plinth? Pl. Send ans. Yourlifeme@indiatimes.com
what is the maximum depth at which the open foundation bridge can be done
Means of interrupt in cpu operations?
Structural wall & slab : Binding wire fixing is alternatively spacing is correct or wrong?. binding wire fixing is all spacing is must or not?
Why do u want to join vastu vihar
what are the differences of software life cycle models
I am Planning to Contruct a floor appartment on my own thro a Contractor . How to estimate the Constrction Cost , to negociate with the Contractor.
what is the design architecture of cognos8?
What is the more accurate formula to convert wet concrete to dry aggregate instead of the 54% method?
ssc cgl 2010 may tax assistant ki cut of kya hogi
Density of plasterboard 15 mm
How is BP in CRM synchronised with R/3? What r all the steps involved?can we do the partner determination based on SALES AREAS?
What is meant by fetch and execute cycle in cpu operations
Why did the wall of Romanesque Churches have to be so thick?