Answer Posted / varaprasad
First find Lp HP in transmitter and lrv ,urv you can find than will go calibration procedures you have to hp side to be connect hand pump and lrv to urv compared 4 -20ma rage in percentage 0,25,50,75,100.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to Calibrate Flow Switch in field
selection of the zener barrier for the hazardeous area zone 0
What is the use of GMV in turbine?
can u briefly explain aboutan aryton shunt multirange DC ammeter?
If a control valve is hunting means means if we are giving 50% to the cv, the cv will open at 51% then slowly slwoly it will reaches 49% , so what to do for solve this problem. The cv is double acting and mounted for anti surge operation, it having 4 nos. volume booster, one sov, one positioner, etc..?
how to design orifice plate?what is the equation?
I was working on calibrating turbidity transmitters endress+hauser at effluent polishing plant.We calibrated using NTU buffers.What happened is that when we immersed the sensor, everytime we raise and lower the sensor gradually, the reading will vary.my question is that is there any specifications on what is the required distance from the bottom of the container with buffer to the face of the sensor?Is it ok to install the sensor in a medium which has turbulence specially if bubbles are present?
Draw a group of instruments interlocked to a Pump & Motor?
protection relay watchdog contact operation?
Describe the function of Accumulator into the Pump
HOW TO CHOOSE FREAQUENCY IN FMCW TYPE RADAR INSTRUMENTS. DESIGN BASIS OR DESIGN CALCULATONS ?
In power plant to measure vibration of a turbine we install sensors. Before install this sensor we have to set gap voltage. What is meant by gap voltage and its use?
what is the reset offset and control system in instrumentation
How we can check the 2 wire proxy switch? & how it is connected to DI MODULE OF PLC?
Explain types of valves?