providing, fixing, removal of pockets of size 100*150*300mm to 500*600*1000mm for foundation. the shuttering material used for making &fixing of pockets shall be removed by the contractor without damaged to pockets. if any damage occurred, the same shall be rectified by the contractor is to handover the pockets to forge shop engineer with proper marking of centre lines, levels etc.

Answer Posted / mr kanas

how much cost

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

1800


What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?

1389


Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?

1577


how to calculate the length diamond shaped striupps in column

2202


Explain the Strength of brick?

648






what is a well

1500


what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????

1645


if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????

1806


Time required for curing of wall tiles before fixing

1756


how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour

1089


How to estabilish reinforcement Steel rolling margin for a building projects ?

3640


For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)

1513


How will you reduce the concrete flow after mixing the concrete

1715


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1355


what is smart building materials?

1582