Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how can we calculate cutting length of a column ring
(300 x 600)

Answer Posted / ashfaque

BBS formula ..2(L+B)+2×10d-5×2d
Column size 600×300 Side cover 40
2×40-600 =520
2×40-300 =220
Total cutting of bar .
2(520+220)+2×80-80
2(740)+160-80
1480+160-80
1640-80=1560 mm

Is This Answer Correct ?    73 Yes 18 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the problems one might face while having a Cantilever balcony?

1600


How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?

1810


How do you calculate the unit weight of concrete?

1175


What is a hatch patterns?

1148


do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?

1737


Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....

2439


What are new methods /technologies of pothole patching?

2462


What is aggregate?

1195


Which brick is best for construction ,either fly ash or AAC BLOCKS

1056


What is progress payment?

1401


How much sand and cement requirement for 1 SQM 125mm thickness Brickwork

4556


For what purpose bedding is used under storm water drains, explain?

1291


How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.

2731


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

2003


explain the advantages of total stasion

2248