what is the difference b/w GSB and WMM?

Answer Posted / kamal chhetri, material engine

GSB= it is the foundation layer of the road pavement, comprising the materials of required sizes as specified in the gradation table, having LL <25,PI <6 and and CBR>30% in order to meet the strength, filter and drainage requirement of the granular sub base and compaction more than 95%
WMM= It is the structural component of the road pavement, comprising the clean and crushed material of sizes as per the gradation required, having PI<6 and strength of the aggregates should not be less than 30% by LAA or AIV and compaction >98%.

Is This Answer Correct ?    31 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why we can use dust in concrete insted of fly ash

1696


questions with answers to face an interview of an civil engineer regarding RCC buidings

2156


What difference comes in constructing of house and a housing complex like society

1424


I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?

1238


What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?

645






how to disign cuplock shuttering and it's matireal requirement snd any related web site

2514


please briefly explain calculating or estimating steel quantity for a RCC column?

1439


What is rolling stock

1889


how much required strength of cement concrete bricks(size 230x115x75mm)

1575


what is m30 in concrete tiles

1892


what is the dimensions of river sand truck trailer or trolly ?

3377


what is the calculation of raw material for 0.35cum of m-15

1037


States some of the tool bars used in cad?

676


I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?

1672


Slump Values for works?

1759