Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference b/w GSB and WMM?

Answer Posted / kamal chhetri, material engine

GSB= it is the foundation layer of the road pavement, comprising the materials of required sizes as specified in the gradation table, having LL <25,PI <6 and and CBR>30% in order to meet the strength, filter and drainage requirement of the granular sub base and compaction more than 95%
WMM= It is the structural component of the road pavement, comprising the clean and crushed material of sizes as per the gradation required, having PI<6 and strength of the aggregates should not be less than 30% by LAA or AIV and compaction >98%.

Is This Answer Correct ?    31 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?

2126


Define What is unit weight of normal concrete?

1226


What is thumb rule in quality and quantity estimation of a Residential building??

1616


Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?

1084


Which is the direction of negative angle?

1037


i want texture painting pwd data

2029


how much of the strength comes from post-production curing

2280


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2999


Explain the various stages of the project planning process in construction?

1108


What are the different types of foundation?

1291


How many kilo-newtons equals 1000 kilogram?

1093


What is the use of offset command?

1096


There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

1610


How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?

1880


indian standard split spoon sampler

1918