Answer Posted / prabu a r
L- long time stands for over load protection time delay settings.
S- short time stands for short circuit time delay settings.
I- instaneous stands for instaneous short circuit time delay settings.
G- ground stands for earth fault time settings
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
Hi, My plant daily consumption is calculated as 3.8MWH but my supplier has sanctioned an power of 2.6MW per day. how can i equal or distinguish this two factors
how to select size of hardware for linking aluminium busbar is it depend on area of busbar or current flowing through bus bar
How will you utilise electrical power? You can start from the generating station.
electrical ques
33kv substation lay out details & line to line & line to earth measurements
please send me jindal previous aptitude and technical question and answer.my email id is deep_raj@live.com
What do you mean by distribution transformers?
What is the general system requirement of alternator?
what are different types of electrical windings? i know the distributed winding ,concentrated winding etc but i want some detailed information, in what condition we will use distributed,concentrated windings what are the difference between them which is best, how induced emf changes by using different types of windings 20 hours ago - 1 week left to answer
What is line resistance of cable & how it can be measured ?
what is LSR?
how to find out cable size if load is 2800 watts, 230 volts AC supply and load distance is 1800 meters
How eddy current generation support the idea of train braking?
Explain the advantages and disadvantages of hydropower plant?
What should be current in the Primary and secondary side of 1000KVA (11KV Supply)Transformer.?