Answer Posted / danish
if you are going to built structure on soft soil then you should check at which point there is a hard strata, if you found it at nearer depth, it will be good otherwise you should adopt raft foundation or pile foundation. in most cases pile foundations are used. one thing is important in that case that you should have to maintain the air gap below the ground beam otherwise it can be damaged by uplift pressure of soil as the black soil having the tendency of uplifting during rainfall.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Coverage of 25mm.thick ratio of 1:4 cement mortar?
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
Which is stronger solid steel rod or hollow steel pipe?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
What are the advantages of cad?
mix design procedure for 1:6 cement mortar
What are the skills required to become an architect?
Why nautical mile is different from statute mile?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
How to calculate steel for beam slab and column
The largest size of paper used in plotter to print the drawing made by Autocad .
How to calculate quanty of steel in four leg stirrups?