Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why field winding is placed on rotor winding not on stator
winding in case of synchronous machine?

Answer Posted / nakshatra jha

it is economical to have armature winding on stator and field winding on rotor and only two slip ring are required in synchronous machine so reduced the slip ring the machine become more efficient, that reason we provide armature winding on stator and field winding on rotor.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to use computer cpu ups use for home inverter circuit board

1769


What is the difference between grid and off- grid system??

1934


Hi,iam a diploma in electrical engineering.rtd from indian air force in apr 2007.prsently working in reliance next link as a network maintenance engineer since 2007,can i get a job in motherson sumi.

2349


How many types are using in 220kv/400 kv swith yard

2173


what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero

2253


how to calculate singlephase motor efficiency?

2218


An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.

7666


How to calculate KVA/VA rating of PT or CT from primary & secondary voltage or primary & secondary current?

2407


Why human body feel electric shock?

1054


For electrical designers what are the standard should know? i want learn about this standards. how to get information/reference. anybody help in this regards please.

2108


How can we calculate ac current from the given DC current when AC voltage is given?

1931


how to copy from plc ge fanuc versamax series,all input and output, adress, and printout.

2482


Calculate torque developed by the 3-phase, 5 H.P., 4 pole induction motor runs at 1500 rpm A 23 N-m B 21 N-m C 10 N-m D 0 N-m

5178


how to setting Load amps tripping time and extra settings for load Transformer protection relay with RMU panel using C&S model relay..?

1116


draw the full wave and half wave circuit of 3 phase system and inverter circuit used in upsĀ 

2376