what is mean by xlpe swa pvc

Answer Posted / mendsaikhan

What is CU mean ? example 3C x 95 mm2; 35kV; CU/XLPE/SWA PVC cable. Please send me answer to my email address. Thank you all.
mendsaikhan@lutgun.mn

Is This Answer Correct ?    0 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how can i determine the KVA/MVA rating of transformer precisely?? is there any standard test?????

1868


WHY DO VOLTAGE TRANSFORMERS FAIL DURING EARTH FAULT IN THE DELTA CONNECTED 6.6KV ELECTRICAL SYSTEM

1540


In siemens PLC, why do we want to move the data ?

1848


How can we calculate the motor frame sizes?

2908


i karmveer bharti persuing b.tech . plz send me syllabus and name of reference books. for preparation of section eng.

1644






Why you want to join non technical field when you are an engineer?

6196


What is the practical way to calculate the cable size for known ampere load?

931


Can you used moeller lzm1 mccb in a dc system with 125vdc and 20ka short circuit current , beside is it have 24 or 48 volt shunt ? Beside how long current can through from An MCB shunt contacts? (like Z7-AS 24 V)?

1601


How many capacitors using in LT panel as per Govt rules?

1496


i need the curve duty cycle and amper for (150 kva @50% dyty cycle) transformer turn ratio :19 and vin 400

1622


what is ic 01,ic 06 ?is it types of cooling?

3773


What magnetic circuit is formed in berry-type constructions and why?

652


pls tell me function of closing coil of A.C.B.

2883


Can Anyone suggest the Standards (IEC or IS) for selecting copper current density?

909


What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side

968