Answer Posted / dr mukesh kumar
In case failure of circuit breaker to open from Main Switch Board busbar when isolating generator this bus tie breaker will isolate that section of MSB to safe guard the prime mover from mechanical damage, as in such situation motoring action will take place in generator.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What will be the impact on motor performance if a LT motor is rewound with changed motor winding data as given below:- Original winding data: total 04 wires = 02 wires of 17 SWG + 02 wires of 16.5 SWG. Changed Winding data: total 03 wires of 15.5 SWG wire size Motor rating: 160KW, 740RPM, 415V, ID FAN application. Normal Running Current = 95% of FL Current.
What is the effect on in Zone and out zone fault if Phase side CT is Vk/2<30 mA and Neutral side is CT is Vk/4<30 mA for Transformer REF protection
What are the types of instrument transformer?
state types of reflectors in illumination engg. ???????
What is the basis for selecting Vk/2 or Vk/4 for REF and Differential protection of Transformer and What is the significance of magnetising current
what purpose to use excaiter in DG.?
we have provided 30 nos. relay contacts in panel.I want to know how do we do the numbering for the relay contacts as per any applicable standards
1 Ton is equal to how many watts?
I completed iti in2004 I was worked in A grade contractor can I get c licence
What is the Minimum winding resistance of motors ( small & big)? referance range
what is the id1 & id2 setting in differential protection relay of CSPC?
Why current shoots up in the secondary on the knee point voltage during saturation test of CT? How core saturation effects the secondary current (while the primary side is open)? What the logic behind this?
Importance of fault current in power transformers and how to monitor the same? How is it different from winding temperature?
how we control automatic generator i'e with to supply (main supply and local generator) when the main supply was break to supply the local supply automatically to begin supplying power.I now this control circuit is the combination of contactor time delay contactor switch and overload relay .but my question is how we combine those component thank you
What is warm / cold start of HT motors. How many warm start & cold start are possible in a day?