Answer Posted / waqar
you should calculate in R/M nt in m2
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is bylayer?
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
what is civil all interview questions
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
What is braced excavation all about?
how we calculate the vol.of wet concrete..?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
How much quantity of rod binding work by a rod binder per day
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
how to calculate the size of triangular ring in rcc column?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
plumbing CPVC fitting FTE Brass full form
Tell me about triple point of water.
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.