If a load test has to run for 4 hours with 2,000 users, and
the average iteration completes in 10 minutes, how many
transactions will run per minute? can any give the calculation
please.
Answer Posted / sharmila rahman
Time taken for one iteration to complete = 10 min
No of iteration completed in one min(1 User) = 1/10 = 0.1
No of Iteration completed by 2000 users in one min = 0.1*2000 = 200
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
What is lr-function?
How do you identify which protocol to use for any application?
what are the risks you faced with loadrunner
How can you set the number of vusers in loadrunner?
What is a correlation?
What are the four selection methods when choosing data from a data file?
During the load test, what is the optimum setting for logs?
Explain the difference between automatic correlation and manual correlation?
Which components have you used in loadrunner ?
How can we find database related issues?
What should be done to view parameter substitution in the execution log?
When loadrunner is used?
What are the information contain by script windows for each script in the list?
What is scenario default?
What is the advantage of using loadrunner?