What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?
Answer Posted / amit sharma
300*300 10dia
Cover deduction from sides 40*2=80
1. Ring size = 300-80 = 220
Sides 4*220=880
2.For hook take 10*d=10*10*2 = 200
Now deduction for bend. so below 16 dia its 1.5d or above 2d so
5*1.5*10 = 75
Now = 880+200+75 =1155
Now every one forget one thing when we bend the ring around the bar suppose that bar is 32 dia so dia/2 is also include at every bend of the ring.
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
what is flashing?
What is Curtailing of R/F
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
what is the difference between np2 and np3 concrete mix
why top layer of block work shoud be full size if any cut block adjustable than another layer?
What is limit state method and working stress method and ultimate method
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
What are new methods /technologies of pothole patching?
types of piles detail,
TELL ME THE EQUATION FOR OGEE SPILLWAY
What is rate of concrete surface rendering work per sqm
how to shuttering is used in slab
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.