why we use stub column

Answer Posted / uar

The column which restricted at basement level (not allowed to parapet level through roof slab for economical considerations) of a building is known as Stub Column

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

One House is being constructed by an Civil Engg. all pillars are as per structure, but north side there should be 4 pillars among two at back side were 6" inside from the border and remaining two comes front were placed 1'6" inside. is it ok as per vaastu, else if i alter the alignment what would be the best idea, kindly help me.

2198


Who is responsible for territory? can you please help me in getting the answer for this

1880


types of load

1888


Dear Sir, I got 90kilowat and 3 face for my house.So which cable is the best for my home main line. Thanks Bashir Ahmed e-mail: bcon.ba.bd@gmail.com

2227


I am Planning to Contruct a floor appartment on my own thro a Contractor . How to estimate the Constrction Cost , to negociate with the Contractor.

1759






. A BSC can contain ___________ number of BCF packs.

2354


The telecommunications offered by the GSM PLMN may be divided into three main groups.what is it?

2519


why you want to become artictecture

1954


ssc cgl 2010 may tax assistant ki cut of kya hogi

1873


Is there any symbolic or cultural significance behind the structure of the buildings you are observing?

1993


what is the maximum depth at which the open foundation bridge can be done

3442


What details do you notice about the way this building is constructed? How does it differ from your own home?

2226


what cut of marks in cgl2010 tier2

2224


what advice do you have for Architectural Draughtsmanship student who wish to became architects?

3321


Structural wall & slab : Binding wire fixing is alternatively spacing is correct or wrong?. binding wire fixing is all spacing is must or not?

2159