Answer Posted / harish
1*1
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the theoritical percentage of concrete cubes testing per day?
is concealed wiring a problem in fly ash brick wall?
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
How to marking the building
how we can find sieve #4 is 4.75mm?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
What is quantity of cement and sand required for 2000sqft of tiling?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
pls tell me about method of cutting length of ties column
Mention what are the composition of a landfill?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
whats is difference between anchorage length and development length