check list of maintenance of transformer?
Answer Posted / mohamed fazil
1. check cooling system of transformer and its control circuit.
2. Bushing are cleaned by soft cotton cloth.
3. Take oil sample in drain valve and send its to testing like BDV, Moisture content test,acidity test.
4. Check buchholz relay and its switches(trip switch and float switch).
5. All the terminal boxes should be cleaned.
6.Check oil leakage in transformer and rectify its.
7. Control panels (r&c, RTCC) to be cleaned.
8. Winding resistance check.
9. Insulation resistance check.
10. DGA test carried out in above 132kV transformer for 1 year and below 132kV for two years.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
The loads are connected with phase and ground then why current flow as the loads ?
hi friends this is a newcomer in your community of enthusiastic peoples. i am preparing for SSC (CPWD JUNIOE ENGG EXAM FOR ELECTRICAL) pls guide me on the same how to crack it? PLS LET ME KNOW IS ANYONE THERE WHO PASED IT? CAN I GET THE QUESTION PAPERS OF PREVIOUS EXAMINATIONS?
In a Impedance Based Distance Relay (Quad Characteristics) - Could there be two different Line Angle(RCA) for Ph-Ph & Ph-Gnd? If So Kindly Let me Know.. Where, What are the advantages of the same?
what is the calculation method to design core and winding of a 200kva 3phase distribution transformer?
Why two phase welding machine is used instead of three phase welding machine.
What are the various kind of cables used for transmission?
WHAT IS MEANT BY INSULATION CLEARANCE IN VACCUM?
how the phase convertor changes the no. of phases
what is load despatching
Capacitor is load free component but why ampere meter shows current when capacitor bank breaker close?
what r substations?what r there work?why voltages r incresed and then reduced during distribution of power
what is the difference between vector scale and vector diagram?
In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.
Dear sir my name Ankit i m Diploma holder present working in Welspun Corp ltd Anjar as Asst.engg (salary 14400/month ctc) i Would like to change my company also i have selected in ford India pvt ltd Sanand as trainee Tech with salary 12000/month so please suggest me for changing my job hope for *ve response
WHAT IS DIFFERENCE BETWEEN MANUAL CONTROL AND MAGNETIC CONTROL AND STATE ITS ADVANTAGE /DISADVANTAGE