Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1 cubic meter contains how many bricks

Answer Posted / bishnu kansari

A standard brick size is 0.230m*0.110m*0.075m
after 10mm mortar new brick size is 0.240*0.110*0.085
because mortar used in length wise and height wise not width wise
after mortar volume of 1 brick is 0.240*0.110*0.085=0.00224 cu.m
so,
number of bricks required for 1 cu.m brickwork is
1/0.00224=446.43nos

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags

2424


How to find out slope footing concrete

2960


how do you stabilize a waterlogged area in road construction

6797


Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.

2985


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2170


How to come 1.54 from dry to wet concrete? 

2275


how to calculate freeboard in under ground water tank and technical details

3411


What is c.g.i sheet which used for roof??

1946


what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain

1805


How do you measure water flowing through 300mm diameter pipes?

1137


material used for mendrel use to bend epoxy coated rebar

2177


what mean By core Billing

2321


Minimum and maximum size of the building components

2244


Define What is an ice dam sock?

1313


Explain moment of inertia and its importance.

1322