If a Page is having 5 Links and there are 5 users and each
user is clicking on one link. How can we achieve it in
Loadrunner.
Answer Posted / chandra sekhar.k
IN Parameterize the 5 links with sequential each iteration, TO So that each Vuser Picks one link sequentially and executes further
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How you load a loadrunner agent?
What is the basic credentials should be provided while recording SAP-GUI?
How many types of graphs are available in loadrunner?
What is the vuser in the scenario?
What would be your recommendation to improve performance measure?
What is parameterization & why is parameterization necessary in the script?
What is difference between manual scenario and goal oriented scenario?
What is remote command launcher?
What is a difference between pacing and think time?
How could you measures Https/Sec ?
Hi guys I am pravash kumar satapathy having 4.5yrs experience in loadrunner .i am providing online training in loadrunner,jmeter .if any body are interested directly u can call me or mail me pravashkumarsatapathy@gmail.com pk.loadrunner-----skype 9437629024
What is the difference between load, performance testing?
How can you set the number of vusers in loadrunner?
What is report header and what are the information contains?
What are the different sections of the script? In what sequence do these sections run?