plz tell.. how can we find weight(in kg) of 1 cum of m20
mix..? how can we find the ratio of cement sand and
agregate on site i.e if we given some amount of m20 mix
then hw we find the ratio..?
Answer Posted / ganesh
Dear one,
M20=1:1.5:3 Ratio and M15=1:2:4 all the calculation which given above is not as per Standard so pls post the right one because any one of juniors can follow it blindly,
OPC ( Mix ratio of 1:1.5:3 - M20) ORDINARY PORTLAND CEMENT
Volume - 1 + 1.5 + 3 = 5.5
Total volume of ingredients used = 1.57 Since we use volume batching, wet volume of concrete is 1.57 times the dry volume)
Volume of coarse aggregate required "(3/5.5) *1.57 = 0.856 cu.m
=0.856 * 35.314 = 30.24 cu. ft"
Volume of sand required "(1.5/5.5) * 1.57 = 0.428 cu.m
= 0.428 * 35.314 = 15.12 cu.ft"
Volume of cement required "(1/5.5)*1.57 = 0.2854 cu.m
=0.2854 * 1440 = 411 kgs
= (411/50) = 8.22 bags"
| Is This Answer Correct ? | 17 Yes | 1 No |
Post New Answer View All Answers
1m square 20mm plastering how much of water need curing work
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
Moisture content calculation for diff mix ratio's ??
What is proportion of PCC Grade G?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
what is the Asfalt test?in road constraction..?
How did the romans get water up hills using aqua ducts?
What is the general specifications of a bituminous pavement road?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
What year was the keystone power plant in Indiana County constructed?
Stringer How many cm goes to landind
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
how do you stabilize a waterlogged area in road construction
Why reinforcement done in shorter span in two way slabs