how to calculate the steel quantity for beams & columns
also footing net?
what is the formulae for calculate the steel quantity?
what is mean by (100.3)plinth level?what is mean by 100.3?
explained it?
Answer Posted / vittalanand
0.089 % of concrete is requirement of steel
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how much shouid be the rate for ready mix concrete per cubic meter
What year was the keystone power plant in Indiana County constructed?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
What are the phases inspections are done by local authority while construction?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
What is meant by cartesian coordinate system?
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
What is different between DI Pipe and CI pipe?
How to decide/consider the grade of bitumen for dbm.
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
how to conversation of all construction material in to brass
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
where can i get the previous question papers for rrb section enginerr (civil)
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in