for assembly supported beam main bar are provided at ?
Answer Posted / vittalanand
bottom above 1.5 times dis of main bar as cover
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
what is the coefficient for running feet to cft coversion both area and price
how much shouid be the rate for ready mix concrete per cubic meter
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
How much cement and sand required for 9"brick wall per square metre
What is the name of this multiplication factors ?
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
insted of bentonite we can use any alternate material in piling ?
How many % we consider for lap for reinforcement for estimates
What is absolute pressure? How absolute pressure is calculated?
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
What is progress payment?