for assembly supported beam main bar are provided at ?

Answer Posted / vittalanand

bottom above 1.5 times dis of main bar as cover

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS

4218


what is the coefficient for running feet to cft coversion both area and price

1923


how much shouid be the rate for ready mix concrete per cubic meter

1457


What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?

1693


how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm

1641






if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????

1808


How much cement and sand required for 9"brick wall per square metre

2475


What is the name of this multiplication factors ?

1701


what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix

4505


step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed

1908


insted of bentonite we can use any alternate material in piling ?

1700


How many % we consider for lap for reinforcement for estimates

1362


What is absolute pressure? How absolute pressure is calculated?

668


std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30

1606


What is progress payment?

703