Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

We have yokogawa cs3000 one fcs and 4 his. After download to his, showing successfully at es, but not transferred to his.

Answer Posted / jigaranadkat

Dear,

First of all question is not clear that you are downloading what ? presume that you are downloading Graphics as other configuration will be downloaded to FCS and then automatically it will be "Equalized" to all HIS.

When you download any graphic in Engineering work station, the particular graphic will not appear in HIS unless you have pasted same graphics shortcut to any HIS. So, you can follow this procedure :

1) PASTE shortcut in respective HIS.
2) Once you download the required graphic in Engineering workstation the close the builder and select the particular graphic and in TOOLS MENU select the option DOWNLOAD TO HIS.

By this your graphic will be EQUALIZED in all HIS where you have pasted the shortcut of that graphic.

Fell free to post your result or any further question on :

Jigar Anadkat
E-mail : anadkat.jigar@gmail.com

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is standard procedure of manual mapping in Radar type level transmitter?

1952


for oil & gas industries which zone is normally preferred? why? give its example?

2008


Calibration procedure for Electro magnetic Flow meter

4491


Give 2 application of quartz crystal used for process parameter measurement.

2020


How can we use feedback signal frm rtd for monitoring and in dcs for controlling ,then which type of rtd is sutaible 2 , 3,4wire and why ?

1622


field bus transmitter calibration procedure tell me

1832


What is modbus?

1210


Can combine control system for Emergency control system (ESD)and Fire & Gas System ( F & G) is possble to built and offer to client? Can such system is as per Norms in India?

1994


Why thermo wells are used? What materials are used in thermo wells?

1119


when placing a vent or drain hole on an orifice plate should you measure from the center of the bore up or down for the vent placement?

1770


In VVVF DRIVES VOLTAGE IS ALSO VARY WITH THE FREQUENCY. HOW? WHAT IS THE DIRECT FORMULA RELATING THESE TWO.

2370


Turbidity analyzer working principle ?

1790


Draw a complete P&ID of a flow suction tank indicating all control & protection equipment. Indicate all its inlets and outlets. Explain the controls for this system

1535


we are using centum vp as monitoring with Dell precision work station T3600 but some times PC(s) are restarted automatically . how we can solve this problem? thanks

2184


Explain PID controller tuning & any one method used for it.

7815